On-site commissioning

Ensure that the equipment in your business runs smoothly

What are the benefits of entrusting us with the task of on-site commissioning of equipment?

We fully understand our clients’ needs, which is why we treat every project as unique. We provide full technical support during on-site commissioning of our solutions. Cooperation with us means:

professional implementation

guarantee of correct configuration

savings in time and resources

optimisation of equipment performance

training, guidance and support

The sectors that most frequently use our commissioning services

Professional energy sector

On-site commissioning of equipment at power generation sites ensures that it is correctly configured and operates safely within the grid. We guarantee standards compliance, system stability and optimisation of parameters for maximum efficiency. With our services, you gain reliability and operational certainty even in the most demanding conditions.

Industry

On-site commissioning of equipment at industrial sites ensures it is correctly configured and integrated with existing systems. Thanks to professional setup, we minimise the risk of breakdowns, reduce downtime and enhance the efficiency of production processes. Our services guarantee stability, safety and full compliance with the plant’s technical requirements.

The RES and distributed generation market

On-site commissioning of equipment at RES and distributed generation sites ensures that it is correctly configured and integrated into the grid. Thanks to professional setup, the installations operate optimally, safely and in accordance with applicable standards. Our services guarantee reliability, maximum efficiency and stability under variable operating conditions.

Take advantage of our on-site commissioning services

Uruchamianie na obiekcie 1
Take advantage of our on-site commissioning services and rest assured that your equipment operates safely, reliably and in compliance with standards. Professional configuration minimises the risk of failure, boosts efficiency and ensures full integration with existing systems. Choose experience – we’ll prepare your equipment to operate in the most demanding conditions.
Obraz
Słupy energetyczne
Obraz
Właściwa eksploatacja i cyfrowe zarządzanie farmami
Obraz
Magazyn Tauron
Obraz
Klaster Słupski

Find out how we support
our clients

Behind every project lie specific stories and challenges. Read about the challenges other companies have faced and the solutions we have implemented together.

See all projects

The Apator Group with an innovative IT solution for the Słupsk Cluster

Find out more about systems that give you full control over processes, enabling you to ensure the optimal use of local energy from RES.

Energy storage in the low voltage grid for TAURON Dystrybucja

Find out how energy storage helps stabilise the operation of the low voltage distribution network.

Operation and digital management of fotovoltaic farms

Find out more about how EKTIN software is used to monitor fotovoltaic farms

Pilot project to build a smart grid

Find out how a smart power grid with remote control and automation for protection systems is created

Frequently Asked Questions

Do you have any other questions?

The activation of a single protection device or telemechanics system is defined as:
• switching on the power supply,
• checking the consistency of the current status of the contact inputs (at the device input)

with the data intended for transmission to the master system,
• checking a single control (on/off),
• checking a single measurement,
• establishing connectivity with the concentrator or master system.
Starting a single concentrator/controller is understood to mean:
• switching on the power supply,
• loading data into memory,
• checking connectivity with the master system,
• checking cooperation in telemechanics (signalling, control, measurements).

Unless otherwise specified in the Tender, the commissioning and testing of the facility does not include:

• the costs of detailed testing (not covered by the commissioning scope) of the proposed cooperation
devices with the facility,
• costs of the company’s service department participating in detailed testing of the cooperation of third-party devices with
the facility and the master system.
• the costs of the company’s service department participating in the facility acceptance tests.

To ensure the facility is commissioned efficiently, please prepare it as follows:

• SIM card, not inserted into the device. Please obtain the SIM card from your electricity supplier; APATOR SA does not provide SIM cards,

• a power supply at the site, e.g. a generator – Apator SA does not provide a power supply,

• controller installed at the site, connected to the power supply

• Antennas and other accessories, as well as devices designed for cooperation with the controller, must be installed and connected prior to commissioning

• if tests are to be carried out, please prepare a load simulator and personnel to operate it and conduct the tests – Apator SA does not provide a load simulator and does not carry out full tests (only participation in the testing of telemechanics)

• In the application of EAZs from manufacturers other than Apator SA – during the communication and connectivity testing phase with third-party protection devices, the presence of a protection engineer for the relevant device is required, e.g. uREG, e2Tango, Micom and others.